Professional cleaning solutions · Adiembra, Kumasi
Post-Construction

Church interiors — floors and stairways

Post-construction cleaning of a church interior with a large tiled hall, stairs and landings. Genuine photographs show the transition from work-site residue to cleaned floor surfaces.

Explore the photographs ↓
Church interiors — floors and stairways — completed view
Project gallery

Before and after.

Scope of work: Main hall tiles, stair treads, floor edges and connecting landings.

The transformation: Visible dust, debris and splashes are reduced in the completed views, making the tile patterns and stair edges clearer. Construction equipment was also removed between photographs.

Select a photograph to see the details.

Hall floor beside windows 01

Hall floor beside columns 02

Auditorium — entrance-facing view 03

Auditorium — stage-side view 04

Main hall tiled floor 05

Auditorium — wide floor view 06

Corridor floor 07

Tiered seating steps 08

Upper-level seating area 09

Upper-level aisle — view 1 10

Corner seating area 11

Stair-side corridor 12

Stair treads 13

Auditorium — elevated view 14

Window-side aisle 15

Staircase and railing 16

Tiled staircase 17

Tiled landing 18

Doorway and interior floor 19

Upper-level aisle — view 2 20

Let’s get started

Need similar results?

Share your location and cleaning priorities.

Request Similar Service

CleanSmart Pro

Contact us